    Introduction to light steel villa

    It has a development history of decades in developed countries and is very safe. Seismic performance meets grade 9; It can resist 12 typhoon; The building is extremely fire-resistant.The limit shall meet the 2.5h design standard. Permanent building, high wear-resistant galvanized anti-corrosion coating to ensure structural safety for 90 years.

    The construction cycle of light-gauge steel villas is determined by the Gross leasable area and generally requires 1.2-1.5 workers per square meter. 300 square meters of about 360-450 Labor, that is 10 people need 36 days to 45 working days. A working day is equivalent to a worker working eight hours. As a rule, you can check in after 40 days or so. So relative to other structures, light steel villas in the construction cycle on the victory.

    Features of the Light Steel Villa

    • Safety: anti-earthquake, anti-snow, anti-insect ant, high quality.
    • COMFORT: Sound Insulation, heat preservation, beautiful appearance.
    • Fast: Short construction period, wide application range.
    • Environmental protection: Low Energy Consumption, high recycling rate of building materials.
    • Cost-effective: The use of large area, cost-effective.

    Partial style display

    (For more cases, contact customer service)

    Construction process simulation video

    First class team provides design services

    Material table of Light Steel Villa

    Material table of Light Steel Villa
    The sequence project material Material specifications note
    living room, dining room
    1 The ground Ceramic tile 800 * 800 A simple model
    2 metope Integrated decorative board Waist line
    3 Living room background wall Integrated decorative board TV background wall
    4 Condole top Integrated decorative board The secondary suspended ceiling
    5 The anchor line PVC 10CM
    6 Lamp act the role ofing combination Pendant lamp with simple lamp (without lamp belt)
    7 Switch socket panel combination Siemens
    8 The window is line Bamboo and wood fiber lines 5CM
    9 Vertex Angle Bamboo and wood fiber lines 10CM

    the gates

    1 The ground Ceramic tile A simple model
    2 Condole top Calcium silicate board Putty l paint
    3 Lamp act the role ofing A single Absorb dome light
    4 Switch socket panel combination Siemens

    the kitchen

    l The ground Ceramic tile Accessory (anti-skid brick)
    2 metope Ceramic tile Form a complete set of
    3 Condole top Integrated decorative board Flat ceiling
    4 Lamp act the role ofing A single Absorb dome light
    5 Switch socket panel combination
    6 The door Aluminum alloy door Aluminum alloy glass door (transparent)

    The stairwell

    1 Ground floor stairwell Ceramic tile
    2 Stairwell ground floor, second floor Ceramic tile
    3 metope Integrated decorative board With dado and waist line
    4 Condole top Integrated decorative board The secondary suspended ceiling
    5 The anchor line PVC 10CM
    6 Lamp act the role ofing combination Absorb dome light
    7 Switch socket panel combination
    8 Stairwell step Ceramic tile
    9 Handrail for the stairwell railing local European imitation copper stainless steel

    Bathroom on the first floor

    1 The ground Ceramic tile Supporting (anti-skid brick >
    2 metope Ceramic tile Form a complete set of
    3 Hanging page Integrated decorative board Flat ceiling
    4 Switch socket panel combination Siemens
    5 Wash one Tap with hot and cold water Assorted ark
    And the mirror
    6 Squat toilet on the ground floor Squat toilet white
    7 The toilet is on the second floor The toilet water-saving
    8 shower A complete set of Shower with hot and cold water
    9 The door Flat open the door Aluminium alloy glass door
    10 Bath bully The finished product Including heating, lighting and ventilation
    11 floor drain floor drain Against the stench,
    12 Towel bar The finished product A loan

    the first floor bedroom

    1 The ground Ceramic tile 800 * 800 A simple model
    2 metope Integrated decorative board No dado and waist line
    3 Condole top Integrated decorative board The secondary suspended ceiling
    4 The anchor line PVC 10CM
    5 Lamp act the role ofing ordinary Absorb dome light
    6 Switch socket panel combination Siemens
    7 The window is line Bamboo and wood fiber lines 5CM
    8 The door Flat open the door Ecological door

    Master bedroom on the second floor

    1 The ground Stone plastic waterproof floor 200 * 1000
    2 The wall of blood Integrated decorative board No dado and waist line
    3 Condole top Integrated decorative board The secondary suspended ceiling
    4 The anchor line PVC 10CM
    5 Lamp act the role ofing combination Absorb dome light
    6 Switch socket panel combination Siemens
    7 The window is line Bamboo and wood fiber lines 5CM
    8 The door Flat open the door Ecological door

    Bathroom on the second floor

    1 The ground Ceramic tile Accessory (anti-skid brick)
    2 metope Ceramic tile Form a complete set of
    3 Condole top Integrated decorative board Flat ceiling
    4 Switch socket panel combination Siemens
    5 Hand washing tank Tap with hot and cold water Assorted ark
    And the mirror
    6 The toilet Water saving toilet Cannot be changed to squat
    7 Take a shower A complete set of Shower with hot and cold water
    8 The door Flat open the door Aluminium alloy glass door
    9 Bath bully The finished product Including heating, lighting and ventilation
    10 Towel bar The finished product A set of
    11 floor drain The finished product Stainless steel deodorant

    the second bedroom, a total of other functional rooms

    1 The ground Stone plastic waterproof floor 200 water 1000
    2 metope Integrated decorative board No dado and waist line
    3 Condole top Integrated decorative board Flat ceiling plus top line
    4 The anchor line pVc 10CM
    5 Lamp act the role ofing A single Ordinary ceiling lamp
    6 Switch socket panel combination Siemens
    7 Credit line window Bamboo and wood fiber lines 5CM
    8 The door Flat open the door Ecological door

    the sitting room

    1 The ground Stone plastic waterproof floor 200 * 1000
    2 metope Integrated decorative board Dado and waist line
    3 Living room background wall Integrated decorative board TV background wall
    4 Condole top Integrated decorative board The secondary suspended ceiling
    5 The anchor line PVC 10CM
    6 Lamp act the role ofing combination Pendant lamp with simple lamp (without lamp belt)
    7 Switch socket panel combination Siemens
    8 The window is line Bamboo and wood fiber lines 5CM
    9 Vertex Angle Bamboo and wood fiber lines 10CM
    10 Curtain box of window Integrated decorative board 20CM

    Balcony

    1 The ground Ceramic tile Prevent slippery brick
    2 Condole top Calcium silicate board Flat roof, exterior wall paint
    3 Lamp act the role ofing A single Ordinary ceiling lamp
    4 Switch socket panel combination Siemens
    5 The door Finished product door Aluminium alloy glass door
    6 guardrail local L European imitation copper stainless steel

    1. This configuration does not include all electrical equipment, furniture, windows and soft furnishings.

    2. The above parameters are for reference only. Please consult the customer service personnel for details

    Engineering case

    Interior decoration

    Why Choose HongYe?

    1. Quality control system

    • Purchase materials from famous steel manufacturers and provide traceable product quality specifications.
    • In the manufacturing process, we will have QC for quality inspection in every process.
    • Before loading the steel into the container, we will arrange for QC to inspect all the steel.
    • In our manufacturing process, customers are welcome to come to supervise production.
    • Can be pre-assembled to check quality and connection.

    2. Technical Services

    • Help customers replace foreign materials with Chinese materials (modified drawings will be sent to customers for confirmation).
    • Modify and optimize workshop drawings.
    • Provide professional advice.
    • Answer other technical questions.

    3. Loading management

    • Before loading the container, we will arrange all quality inspectors to inspect all the goods.
    • We have a business manager who checks the quantity when loading the container.
    • Tighten all materials to prevent damage during sea transportation
    • After loading the containers, we will then send you the loading list of each container, and you can check the quantity when unloading.

     

    Get A Quick Quote

      Drop Files Here

      Category

      Download Brochure

      HongYe Brochure

      Contact Us

      Hongye Steel Structure is located in Dongguan and has more than 15 years of experience in the field of steel structure. We can provide customized product solutions for customers from all over the world.

      lee@hy-steel.cn