Installation of steel arehouse buildings are steel elements, pre-built in the factory and brought to the project site for installation.
1. Lifting of the main building
2. Installation of the second building
3. Roof panel and insulation installation
4.P wall panel and insulation installation
5, Trim, and light installation.
Assembling the roof beams, erecting steel columns, lifting steel beams, connecting the second building, repairing the deviation of the main structure, installing crane beams, and mezzanine structure (optional).
Excellent control quality: The deviation of the main structure must meet the design requirements and requirements, and high-strength bolts must meet the conditions at the beginning and end.
tying ropes, roof beams, wall belt, roof and wall, sag rod, etc.
Insert cotton cotton swab first, then insert the roof panel (place a wire mesh under the cotton shutter to prevent falling cotton divider)
The roof panel is primarily a waterproofing problem. So it depends on the overlap between the sheet metal, nailing. And the fullness of the glue. The glue should be clean. Excessive wear should not hurt to prevent rust.
Mainly installation of walls and installation of wall panels.
Excellent quality control: wall area is primarily a aesthetic problem and a waterproof window problem. There is also the problem of installation deviation. For example, the floor should be flat, and the rigid deviation between the wall sheet should meet the requirements.
Gabe decides between roof and wall, wall corner trim in corner wall, base trim between wall panel and brick wall, door and window trim, and so on.
Determining and blinking are the last steps, and one of the key elements of good, horizontal and direct projects, is very basic.
During the construction of prefab steel warehouse buildings, as long as the installation is completed in strict accordance with the construction process and associated procedures, it can therefore effectively avoid engineering problems caused by operational errors and speed up project progress.
1. Before installing a steel structure, the quality of the steel structure should be checked. If a permanent change and partial paralysis exceeds the maximum value, it must be dealt with.
2. For installation of steel columns, check that the field under the baseplate column is strong and flat to prevent the bolts of the base under the baseplate from being unstable.
3. Whether the steel column is straight and there is no movement, during the installation process, before the building can build a stable system, temporary support measures must be taken.
4. When a steel structure is installed to construct a fixed space unit, and after passing the reception check, the construction unit needs to quickly pour the width of the lower column plate and the upper surface of the foundation with expanded concrete.
5. Check the position and bending of the entire plane of the main steel structure structure.
Customize your own Project now: lee@hy-steel.cn