The prefabricated steel structure has good plasticity and toughness, light weight, high strength, easy disassembly and assembly, short construction period, simple construction, and environmental protection. Due to its more applicability and convenience, it has been widely used in warehouses and other buildings. Today let’s talk about industrial prefab steel project customization.
The construction land planning permit is the certificate for the legal use of land by the construction unit, and it is a formality that needs to be completed before the land is allocated. It determines the location of the proposed project, the scope of the land, the nature of land use and other relevant planning indicators. Whether in China or other countries, the first step in construction is to investigate the land use rights to ensure the legality of the construction.
Investigate the surrounding environment, terrain and other factors, and communicate with customers to determine the preliminary design plan. The customization of industrial prefabricated steel projects must adopt the planar frame structure design. Load calculations, design calculations of components and connectors, and structural internal force analysis must be carried out in accordance with the structural layout drawings and design data of steel structure workshops, as well as relevant specifications and regulations. When building a steel structure factory building, we must thoroughly understand the manufacturing process and use requirements. The steel consumption of columns and crane beams will be relatively large. We should combine the project environment and material supply conditions to carry out more economical and reasonable designs to optimize the scheme.
Once the drawings are approved, the factory will arrange production, and the entire production process is carried out on the industrial assembly line of the steel structure processing plant, ensuring the consistent quality of all parts of the prefabricated materials. The finished steel components will be transported to the construction site for installation. This “production-construction” construction mode greatly shortens the construction period and reduces labor costs. In addition, construction waste on construction sites can also be effectively reduced, which meets the social pursuit of energy conservation and environmental protection in modern life.
After the construction is completed, acceptance work will begin. The relevant quality supervision department will carry out the construction acceptance of the steel structure factory building, and finally carry out the delivery stage. So far, this is the whole process of customizing industrial prefab steel project. Thanks for watching.