On July 1st, we packaged and transported the materials of the steel structure warehouse for the old customer in Mali. The project is located in Bamako, the capital of Mali.
Due to the epidemic, customers cannot come to China. However, based on previous cooperation, the client is very satisfied. So they trusted us and quickly finalized new projects.
After we receive the shipping notification from the customer. Preparing for steel structure export container loading work.
Because the material has been placed in advance. We need to rationalize some of the remaining lighter material. Then steel strapping is carried out to ensure that the goods are not easy to slip off during transportation. In less than an hour for the first container, we had already loaded the steel structure material into the container. Then help customers to load other self-provided goods purchased by themselves into containers and complete the loading.
The weight of the second cabinet reached 25 tons. Workers carefully loaded a ton of glass into containers. Finally, the steel structure materials are loaded into the container, and the loading is finally completed.
After checking the cargo list with the warehouse manager and reminding the truck driver to pay attention to the transportation, the container is sealed and the transportation begins.
Customize your own Project now: lee@hy-steel.cn
Hongye Steel Structure is located in Dongguan and has more than 15 years of experience in the field of steel structure. We can provide customized product solutions for customers from all over the world.
lee@hy-steel.cn