Metal Building Packaging & Transportation:
Whether steel building projects are domestic or export projects, steel building and transportation are important storage processes. Once the metal parts are finished, they are tested according to the drawings, appropriate standards, and customer requirements. Appropriate packaging measures will be adopted after passing the test to facilitate long-distance transportation and better connectivity with the metal loading and unloading structure.
The number of loading containers required and size must be calculated and booked in advance for submission of steel structure projects. Due to the large weight and volume of steel structure projects, they usually travel at sea. It is necessary to book a space with the consignor in advance and complete the upload at the transferor time to match the shipping schedule and deliver on time.
The construction of a steel structure is very complex. In addition to large metal parts, there are many doors, windows, and sections. Packing should be strong enough to prevent damage during transport. And packaging is very easy to transport and carry.
Metal Packaging:
With large metal parts, each piece has a number to ensure an accurate value. Covering large parts must be dry before loading, and packaging should protect the component parts from damage, and ensure that the parts and parts are not damaged, damaged, or lost. Upload order and loading method are also important. Improper loading will prevent individual accessories from being installed, or loading is not integrated, causing the accessories to move during shipping and causing additional bumps.
Small parts and accessories (bolts, washers, connecting plates, joint angles, etc.) in metal structure products need to be boxed or assembled. Note the box number, section name, quantity, weight, and other information outside the box. The packaging list is attached for customers to check.
Since glass is weak in the movement of accessories such as doors and windows, they need to be protected with wooden boxes to avoid damage. The wooden box is not easy to be large, so it needs to be ready for forklifts to load and unload. If door and window locks and locks are incorrect in assembling and moving, they need to be packaged separately and listed for easy verification.
If the steel structure is installed immediately after production, small parts and the remaining parts can be tied directly to the required part of the metal structure without a fist. However, they must be securely fastened or fixed with bolts and will not affect movement and installation.
All accessories should be as marked as possible and indicated on the packaging list. The packaging list is pre-arranged and checked individually to avoid unnecessary problems caused by missing parts.
There are many parts to building a metal structure, and proper packing and unloading helps to load, unload, and transport and save space and cargo. Careful inspection and verification during shipment can minimize unnecessary losses caused by improper delivery.